Resources

Install Checklist

An install checklist for workshop teams receiving equipment and consumables on South African sites.

How Install Checklist helps on an active production week

Install Checklist gives workshop teams a clear list for receiving equipment and consumables on site. Use it to confirm delivery condition, fitment basics and the items that should be checked before installation starts.

Use the Install Checklist before crates are opened and parts are scattered. It helps the receiving team record carton condition, pallet count, power supply on site, and whether the machine position is ready for unloading. For South African workshops, that first check matters when courier handover, site access, and load-shedding windows all affect installation planning.

Take photos at the delivery point before anything is moved to the machine area. Record dents, torn wrap, missing boxes, and the way consumables were packed with the equipment. Those images make it easier to match what arrived against the PO and packing list.

Receiving checks before installation

The checklist gives workshop staff a usable record for handover day. It covers delivery condition, basic fitment items, required utilities, and the missing parts that stop installation from starting. Keep one copy with the site file and one with the buyer handling shortages or replacements.

Send the completed Install Checklist through the contact form with the delivery note number. Include machine model, available power, forklift access, and any item that arrived short or damaged. If consumables were packed separately, list those boxes as well so the receiving count matches the courier drop.

  • Crate count checked against delivery note
  • Power and access confirmed before unloading
  • Photos attached for damage and shortages

Site conditions that affect handover

Sunnyrock dispatches often land at busy workshops where production cannot stop for long. The Install Checklist helps separate urgent install issues from later setup tasks such as cable routing, extraction connection, or consumable restocking. That matters whether the delivery goes to Johannesburg, Durban, Cape Town, or a smaller industrial site with limited unloading space.

Coastal moisture can affect packaging, bare metal surfaces, and stored media before setup starts. Inland dust and unstable power can change how rails, sensors, and control cabinets are checked on arrival. Note these conditions on the sheet so the install team sees the site picture before tools come out.

Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.

What to capture on the sheet

Share the Install Checklist with site photos, delivery timing, power details, and anything that has already failed or arrived short.

Complete the checklist on the day the goods arrive, not after boxes have been mixed with site stock. Add the PO reference, delivery time, photos, and the name of the person who signed for the shipment. That record helps the buyer, the workshop lead, and the installer work from the same facts.

What our Workshop Supplies customers say

Verified Google reviews