Commissioning CNC, laser and print machines in the workshop.

Commissioning checks before first production

Checking all machine and address details before production ensures a smoother start for CNC, laser, and DTF installations. Outstanding items that still need attention before production begins should be listed once the workshop is ready.

Extraction system setup, air supply condition, and the type of first test material—such as MDF, acrylic, steel, vinyl, PET film, or transfer powder—should be confirmed before commissioning begins.

Site records are most useful when they describe the actual install position, cable routing, extractor placement, and clearance around the bed or gantry. For your own records, note the electrical point location and the details from the machine data plate so the information matches what is present in the workshop.

Commissioning record details

Show installed items, checks still required, and which safety or setup steps remain before running any customer job, such as levelling, focal or height setup, lubrication, software connection, emergency stop test, and sample material sign-off.

Extra parts or consumables that are still required should be logged in the commissioning record ahead of daily operation. Site details, control cabinet model, or any alarms shown on screen can be added to the log as soon as they are available.

A commissioning log should include machine, site and utility details:

  • Machine, site and utility details

Getting your workshop ready for setup

If installation still needs hoses, cable chains, lenses, blades, wipers, ink, film, or cleaning supplies, arrange these before commissioning is completed. Inspect rails, optics, electronics, and consumables to confirm everything is ready for operation in your workshop. Ensure all items required for the first run are available.

Utility supply in industrial areas can affect VFDs, heaters, compressors, chillers, and print curing equipment during initial tests. Record what extraction is connected, and note any courier access instructions such as gate codes or delivery procedures for the site.

Commissioning log requirements

Log the machine model, serial number, software version, operator details, and materials chosen for initial test runs. List any faults, signs of damage, missing components, or sealed accessories to ensure the record covers every item at the site.